Analisis Perhitungan Quantity Take Off Struktur Jembatan Beton Bertulang Menggunakan Metode BIM (Revit) (Studi Kasus: Jembatan Ruas Batu Panjang – Pangkalan Nyirih, Kecamatan Rupat)

Authors

  • Nadia Sahira Politeknik Negeri Bengkalis Author
  • Dedi Enda Politeknik Negeri Bengkalis Author

DOI:

https://doi.org/10.62710/jx5hmm70

Keywords:

Quantity Take Off; Building Information Modeling; Autodesk Revit, Reinforced Concrete Bridge; Accuracy; Efficiency.

Abstract

The development of Building Information Modeling (BIM) provides an effective alternative for Quantity Take Off (QTO) calculations in reinforced concrete bridge construction. Conventional QTO methods based on two-dimensional drawings are prone to human error and require considerable time. This study analyzes the QTO results of the reinforced concrete structure of the Batu Panjang–Pangkalan Nyirih Bridge, Rupat District, using Autodesk Revit, compares them with conventional calculations, and evaluates their accuracy through percentage error and Root Mean Square Error (RMSE). A quantitative comparative approach was employed by modeling the bridge structure in Autodesk Revit and calculating gross concrete volume, reinforcement volume, and net concrete volume for the box culvert, abutment, wing wall, and loneng components. The results indicate strong agreement between the two methods, with an average percentage error of 0.028% for concrete and 1.247% for reinforcement. The RMSE values were 0.032% and 1.374%, respectively. The main differences were found in reinforcement calculations because Autodesk Revit models reinforcement details more precisely, including bar lengths and bends. These findings demonstrate that BIM-based QTO using Autodesk Revit is a reliable, accurate, and efficient alternative to conventional methods.

Downloads

Download data is not yet available.

References

Abma, V., Sulistyantoro, T. N., & Nugraheni, F. (2024). Exploration of BIM automatic quantity take off for contractor on bridge structural model.

Adha, E. S., Bayzoni, B., Ashruri, A., & Husni, H. R. (2023). Penerapan building information modeling (BIM) dalam perbandingan quantity take off material pada jembatan Kecamatan Way Bungur Kabupaten Lampung Timur.

Azhar, S. (2011). Building information modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry. Leadership and Management in Engineering, 11(3), 241–252.

Demastio, F. (2024). Analisis perhitungan quantity take off menggunakan metode BIM (Revit) beton bertulang.

Eastman, C., Teicholz, P., Sacks, R., & Liston, K. (2011). BIM handbook: A guide to building information modeling for owners, managers, designers, engineers, and contractors (2nd ed.). John Wiley & Sons.

Farizah, D. (2024). Analisis perhitungan quantity take off menggunakan metode BIM (Revit) beton bertulang.

Tigauw, F., et al. (2023). Analisis perhitungan quantity material take off (QMTO) struktur bawah jembatan tipe skew menggunakan metode BIM.

Hardin, B., & McCool, D. (2015). BIM and construction management: Proven tools, methods, and workflows (2nd ed.). Wiley.

Kementerian Pekerjaan Umum dan Perumahan Rakyat. (2022). Analisa harga satuan pekerjaan (AHSP).

Nafiyah, R., & Martina, N. (2022). Analisis quantity take off pada pekerjaan struktur bawah jembatan.

Setiawan, A., Fassa, F., & Kusuma, N. H. (2024). Analisis komparasi perhitungan volume pekerjaan struktur berdasarkan metode SPMI dan BIM (Autodesk Revit).

Simatupang, F. J., et al. (2024). Quantity take off comparison using building information modelling (BIM) with Autodesk Revit software and traditional method.

Published

2026-07-29

How to Cite

Sahira, N. ., & Enda, D. . (2026). Analisis Perhitungan Quantity Take Off Struktur Jembatan Beton Bertulang Menggunakan Metode BIM (Revit) (Studi Kasus: Jembatan Ruas Batu Panjang – Pangkalan Nyirih, Kecamatan Rupat). Jurnal Ragam Pengabdian, 3(2), 4287-4297. https://doi.org/10.62710/jx5hmm70