Model Optimasi Konsolidasi Hot Dan Cold Maintenance Untuk Peningkatan Keandalan Operasional Pltmg Ambon Peaker Pada Sistem Kelistrikan Terisolasi
DOI:
https://doi.org/10.62710/cd7mf872Keywords:
Gas Engine Power Plant, Hot Maintenance, Cold Maintenance, Maintenance Consolidation, Outage Window, Optimization Model, EAF, FOR, MTBF, MTTR.Abstract
The Ambon Peaker Gas Engine Power Plant, with an installed capacity of 39.12 MW, plays a critical role in maintaining the reliability of the Maluku power system, which operates as an isolated system. As a peaker plant, the unit is required to maintain high operational readiness in responding to load fluctuations and system disturbances. However, frequent start-stop operation accelerates component degradation, increases maintenance requirements, and raises the risk of equipment failure if maintenance activities are not properly structured. Maintenance activities in gas engine power plants are generally carried out through Hot Maintenance and Cold Maintenance. Hot Maintenance minimizes operational disruption but is limited in terms of component accessibility, inspection depth, and occupational safety. In contrast, Cold Maintenance enables more comprehensive inspection and repair but requires unit shutdown and affects plant availability during the outage period. This research applies a descriptive-analytical case study approach through maintenance activity identification, classification based on operating conditions and outage requirements, model parameter development, consolidation scoring, scenario analysis, and expert validation through Focus Group Discussion (FGD). The proposed model classifies maintenance activities into Hot Maintenance, Cold Maintenance, Consolidated Planned Outage, and FGD Review. The results show that the proposed consolidation optimization model reduces cold outage frequency from 18 events to 3 events per year. Total outage duration decreases from 198 hours to 162.36 hours. The total cost of the consolidation model is estimated at IDR 1,353.6 million, resulting in cost savings of IDR 1,425.4 million or 51.3% compared with the baseline condition. In terms of reliability, the model improves EAF from 81.50% to 82.48%, reduces FOR from 8.50% to 6.70%, increases MTBF from 840 hours to 926.5 hours, and reduces MTTR from 22 hours to 19.74 hours. The contribution of this study is an applicable maintenance consolidation optimization model for peaker power plants operating in isolated power systems. The model can support structured maintenance work packaging, reduce repetitive maintenance activities, optimize resource utilization, improve planned outage effectiveness, and strengthen maintenance planning for the Ambon Peaker Gas Engine Power Plant.
Downloads
References
Al Ameeri, T. A., Ab Rahman, M. N., & Muhamad, N. (2023). Analysing Effective and Ineffective Impacts of Maintenance Strategies on Electric Power Plants: A Comprehensive Approach. Energies, 16(17). doi: 10.3390/en16176243
Al-Turki, U., Duffuaa, S., & Bendaya, M. (2019). Trends in turnaround maintenance planning: literature review. Journal of Quality in Maintenance Engineering, 25(2), 253–271. doi: 10.1108/JQME-10-2017-0074
Avdić, A., Konjić, T., & Dautbašić, N. (2020). Auxiliary Power Systems of Advanced Thermal Power Plants. In Lecture Notes in Networks and Systems (Vol. 83, pp. 117–125). Springer. doi: 10.1007/978-3-030-24986-1_9
Beagle, D., Moran, B., Mcdufford, M., & Merine, M. (2021). HEAVY-DUTY GAS TURBINE OPERATING AND MAINTENANCE CONSIDERATIONS.
Carazas, F. J. G., & De Souza, G. F. M. (2009). Availability Analysis of Gas Turbines Used in Power Plants. International Journal of Thermodynamics, 12(1), 28–37. Retrieved from https://dergipark.org.tr/en/pub/ijot/article/222649
Darrow, K, Tidball, R., Wang, J., & Hampson, A. (2015). Catalog of CHP Technologies: Reciprocating Engines. U.S. Environmental Protection Agency, Combined Heat and Power Partnership. Retrieved from https://www.epa.gov/chp/chp-technologies
KORCZEWSKI, Z. (1998). MARINE ENGINEERING Endoscopic examination of naval gas turbines.
Laurent Cornu, Product Manager, 9HA Gas Turbine ADVANCEMENTS IN H CLASS GAS TURBINES FOR COMBINED CYCLE POWER PLANTS FOR HIGH EFFICIENCY, ENHANCED OPERATIONAL CAPABILITY AND BROAD FUEL. (2016).
Molęda, M, Małysiak-Mrozek, B., Ding, W., Sunderam, V., & Mrozek, D. (2023). From corrective to predictive maintenance — A review of maintenance approaches for the power industry. Sensors, 23(13), 5970. doi: 10.3390/s23135970
Narayanan, S., Bhatt, K., & Shad, M. (2022). Condition-based monitoring and maintenance: State of the art review. Applied Sciences, 12(2), 688. doi: 10.3390/app12020688
Niggemeier, M.-L., & Roth, Dr. P. (2024). Backbone of the energy transition: How gas engine power plants can close the gap [White paper]. Mtu Solutions (Rolls-Royce Power Systems).
ISO 14224. (2016). Petroleum, petrochemical and natural gas industries-Collection and exchange of reliability and maintenance data for equipment COPYRIGHT PROTECTED DOCUMENT.
Pinciroli, L, Baraldi, P., & Zio, E. (2023). Maintenance optimization in Industry 4.0. Reliability Engineering & System Safety, 234, 109204. doi: 10.1016/j.ress.2023.109204
Saputra, R. A., & Aribowo, D. (2022). ANALISIS EFEKTIVITAS MESIN DIESEL WARTSILA W20V34DF BERBASIS PERFORMANCE TEST (PT) PADA PEMBANGKIT LISTRIK TENAGA MESIN GAS (PLTMG) AMBON. Vol. 1, No. 2. doi: https://doi.org/10.58169/saintek.v1i2.79
Tiddens, W. W., Braaksma, A. J. J., & Tinga, T. (2023). Maintenance work preparation: A key activity for closing the gap between theory and practice. Journal of Quality in Maintenance Engineering, 29(2), 362–385. doi: 10.1108/JQME-05-2021-0041
Vilas Boas, F. M., Borges-Da-silva, L. E., Villa-Nova, H. F., Bonaldi, E. L., Oliveira, L. E. L., Lambert-Torres, G., Assuncao, F. de O., Costa, C. I. D e A., Campos, M. M., Sant’ana, W. C., Lacerda, J., da Silva Junior, J. L. M., & da Silva, E. G. (2021). Condition monitoring of internal combustion engines in thermal power plants based on control charts and adapted nelson rules. Energies, 14(16). doi: 10.3390/en14164924
WÄRTSILÄ. (2007). WÄRTSILÄ 46F PROJECT GUIDE WÄRTSILÄ 46F-PROJECT GUIDE.
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Arnold Arung, Mokh Suef (Author)

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.