Integration of VSM and SMED for Optimization of the CCB Milling Process
DOI:
https://doi.org/10.62710/v3ny6d36Keywords:
Lean manufacturing, Value Stream Mapping, SMED, PDCA, Productivity improvement, Bottleneck reductionAbstract
Productivity improvement in manufacturing systems requires systematic identification and elimination of waste, particularly in bottleneck processes. This study was conducted at PT XYZ, an automotive component manufacturer experiencing low productivity in the CCB part production line. The milling process was identified as the primary bottleneck, with an initial cycle time of 472 seconds for 6 pieces and an average output of 550 pcs/day, achieving only 75.6% of the production target. This research aims to identify the causes of waste, reduce cycle time in the milling process, and increase production output in line with management targets. The study applies Value Stream Mapping (VSM) to analyze material and information flow, Process Activity Mapping (PAM) to classify internal and external activities, and the Single Minute Exchange of Dies (SMED) method to minimize setup time. Improvements were implemented using the PDCA (Plan–Do–Check–Act) cycle. Root cause analysis using fishbone and 5W+1H identified manual clamping operations as the main contributor to excessive internal time and variability. A semi-automatic pneumatic clamping system was introduced to replace manual bolt tightening and clamp handling. The results show a reduction in internal setup activities from 12 to 9 activities and a decrease in cycle time from 472 seconds to 425 seconds (9.9%). Consequently, daily production output increased from 550 pcs/day to 652 pcs/day, representing an 18.5% productivity improvement and exceeding the initial 10% target. The findings confirm that integrating VSM and SMED with semi-automation effectively enhances operational performance without full-scale automation investment.
Downloads
References
Arfan, M. M., Sugengriadi, R. M., & Ropik, A. (2023). Implementasi Konsep Kaizen Untuk Meningkatkan Output Produksi Line Reconditions di Bagian Produksi PT. XYZ dengan Metode Siklus PDCA (Plan-Do-Check-Action). INFOTEX: Jurnal Ilmiah Bidang Ilmu Teknik, 2(1), 87–101.
Fatinnisa, G. A., & Saifuddin, J. A. (2024). Analysis of Value Stream Mapping (VSM) in the Application of Lean Manufacturing to Minimize Waste at PT. Karya Indah Medika. Vol, 5, 234–243.
Hassan, B., & Pasha, U. (2023). Impact of lean manufacturing practices on sustainable firm performance: an empirical study moderated by lean culture. International Journal of Business and Economic Affairs, 8(3), 14–30.
Hethsia.S, M. (2025). Implementing Lean Manufacturing Practices to Improve Operational Efficiency in Manufacturing Industry. INTERNATIONAL JOURNAL OF SCIENTIFIC RESEARCH IN ENGINEERING AND MANAGEMENT, 09, 1–9.
https://doi.org/10.55041/IJSREM46122
Kartika, H. (2020). Penerapan Lean Kaizen untuk Meningkatkan Produktivitas Line Painting pada Bagian Produksi Automotive dengan Metode PDCA. Jurnal Sistem Teknik Industri, 22(1), 22–32.
Khairai, K. M., & Khalil, S. N. A. (2024). Line balancing study using value stream mapping tool on lean manufacturing: A case study in an electronic industry. Qomaruna: Journal of Multidisciplinary Studies, 1(2), 55–64.
Koh, J., & Singgih, M. L. (2021). Implementation lean manufacturing method of plywood manufacture company. IPTEK Journal of Proceedings Series, 2, 25–28.
Litvaj, I. (2023). Lean management, lean principles, lean manufacturing.
Marcella, S., & Widjajati, E. P. (2024). Analysis of lean manufacturing implementation through the single minute exchange of dies (SMED) method to reduce setup time in the injection molding machine process. Journal of Applied Science, Engineering, Technology, and Education, 6(1), 17–26.
Nurrizky, M. F., Septiana, M. A., Machmudin, J., & Syafii, M. (2021). Peningkatan Efisiensi Mesin Cnc Turning Menggunakan Metode Single Minutes Exchange of Dies Di Pt.
X. Jurnal Ilmiah Teknologi Infomasi Terapan, 7(2), 94–100.
Pena, R., Ferreira, L. P., Silva, F. J. G., Sá, J. C., Fernandes, N. O., & Pereira, T. (2020). Lean manufacturing applied to a wiring production process. Procedia Manufacturing, 51, 1387–1394.
Rahman, A. (2021). Penerapan lean manufacturing untuk meminimalkan waste dengan menggunakan metode VSM dan WAM pada PT XYZ. Prosiding Seminar Nasional Penelitian LPPM UMJ.
Simamora, A., & Insanita, R. (2024). Lean Manufacturing Implementation through Value Stream Mapping on Gold Products. Jurnal Samudra Ekonomi Dan Bisnis, 15(1), 1–15.
Solís-Quinteros, M. M., Zayas-Márquez, C., Ávila-López, L. A., & Carrillo-Gutirrez, T. (2021). Lean manufacturing as a strategy for continuous improvement in organizations. In Lean Manufacturing. IntechOpen.
Wijana, M., Aryadi, I., & Apriyandi, R. (2023). Penerapan Kaizen Dalam Mengurangi Waktu Produksi Untuk Meningkatkan Produktivitas Bottom PDH 160 di PT Inspirasi Kreasi Sejahtera. Jurnal Keilmuan Dan Terapan Teknik Mesin, 11(1), 119–129.
Downloads
Published
Versions
- 2026-03-07 (2)
- 2026-03-07 (1)
Issue
Section
License
Copyright (c) 2026 Yusrizal (Author)

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.